Information
Scope: Excavation, loading and hauling materials for the contruction of Estreito Hydropower Dam
Material moved: 7.479.807 bcm of soil and transition
Material moved: 7.700.514 bcm of blasted rock
Duration: June de 2007 to October 2010
Paragominas Bauxite Operation Mine Implementation
Peixe Angical Operation Hydropower Dam
Vale Operation – S11D TCLD Mine Implementation
Amapari Iron Operation Mine Implementation
Rio Paracatu Mineração (RPM) Operation Tailings Dam
Africa Operation Mine Operation