Estreito Operation

Hydropower Dam

Information

Scope: Excavation, loading and hauling materials for the contruction of Estreito Hydropower Dam

Material moved: 7.479.807 bcm of soil and transition

Material moved: 7.700.514 bcm of blasted rock

Duration: June de 2007 to October 2010

       Back

See too