Information
Scope: Iron ore and waste mining
Total mined: 61.811.047 metric tons
Duration: August 2010 to June 2013
Paragominas Bauxite Operation Mine Implementation
Peixe Angical Operation Hydropower Dam
Vale Operation – S11D TCLD Mine Implementation
Amapari Iron Operation Mine Implementation
Estreito Operation Hydropower Dam
Rio Paracatu Mineração (RPM) Operation Tailings Dam