Information
Scope: Earthworks and civil works for installationof long distance conveyor belt at Serra Sul mine – S11D
Material moved: 2.199.182 bcm of soil
Material moved: 380.992 bcm of transition
Material moved: 636.075 bcm of blasted rock
Compacted fill: 1.887.085 cu. m.
Duration: August 2013 to November 2015