Information
Scope: Excavation, loading and hauling materials for the contruction of Peixe Angical Hydropower Dam
Material moved: 3.862.800 bcm of soil and transition
Material moved: 1.020.200 bcm of blasted rock
Duration: April 2002 to August 2003